Home » Case studies » C165 | Shaybah Power Generation Project
Shaybah Power Generation Project
Fuel Gas Conditioning Packages
| Ref | C165 |
|---|---|
| Location | Saudi Arabia |
| Year | 2006 |
| Application | |
| Contractor | Hyundai Heavy Industries |
| End user | Aramco (Saudi Arabia) |
Products & services
Equipment
3 off Fuel Gas Conditioning Skids.
Application
3 off GE Gas turbines – gas conditioning.
Description
Inlet separator, pressure reduction, electric superheater, hot standby PLC system, with touch screen, HMI all interfacing to DCS using modbus over fibre optic links. Max flow per train 22,300 kg/h. Designed and manufactured in accordance with Aramco specifications.