• OGS
  • OGM
  • OGSI
  • Search website
  • +44 (0) 1353 666640
  • info@oghl.co.uk

OGS

  • Our company
    • About
    • Careers
    • Facilities
      • OGS Ely, UK
      • OGS Swansea, UK
      • OGSI Dubai
    • Downloads
  • Products & Services
    • Metering Systems
      • Bi-Directional Provers
      • Compact Provers
    • Sampling & Analysis
      • Offshore Sampling & Analysis
      • Pipeline Integrity
      • Refining & LNG
    • Process Solutions
      • Fuel Gas Conditioning
      • Compressor Packaging
      • Turbo Expander Packaging
      • OEM Packaging
    • Flow meters
    • Sampling & SmartMix® Jet Mixing Systems
    • Pressure Pyknometers
    • Multiport Valves
    • Engineering Services
    • Customer Services
      • Site Supervision
      • Routine Maintenance
      • Inspection & Testing
      • Supply of Spare Parts
      • Training
  • Experience
    • Case studies
    • Projects
      • Reference List
    • Clients
    • Approvals
  • News
  • Contact
    • Head Office
    • Swansea office
    • Dubai office

Home » Case studies » C245 | Harouge Oil Operations, Libya | Amal Field Metering Systems

Amal Field

Sampling Package

RefC245
LocationLibya
Year2019
ApplicationMetering, Prover, Sampling
ContractorHarouge Oil
End userHarouge Oil

Products & services

  • Sampling & Analysis
  • Sampling Package
  • Download PDF
  • Previous page

Application

The scope of works for this proposal covers the design, build, testing, documentation and readiness for despatch of Qty 9 X Liquid Flow Custody Transfer Metering Packages, including; Three Large Liquid Flow Metering systems including Ultrasonic Flow Meters, Inlet and Outlet Isolation valves, Meter Run instrumentation, Filters, and Strainers.  Three Quality Sampling & Analysis Systems.
One Common Bi-Directional Positive Displacement Ball Prover.
One Comprehensive Metering Control & Supervisory System

Fortnightly Sampling Facility

As instructed in the project specification the construction of the fortnightly sampling arrangement will be undertaken with Parker “A-Lok” twin ferrule 316 stainless steel fittings and Incoloy 825 tubing which will be 3/8” OD. The arrangement would be fixed onto a stainless steel backplate this in turn being mounted inside a cabinet.

The request for “Polyester” cabinet materials was noted in the specification but as the system required that both fortnightly and three-monthly sampling systems are in separate cabinets, OGS believed that stainless steel materials offered a more practical approach to one-off cabinet construction which would be beneficial for the build and appearance of the two separate panels, particularly as these are integrated into a bespoke stand mounted arrangement.

OGS proposed that the fortnightly sample system is housed within a single skin, uninsulated and unpainted 316 stainless steel cabinet which will have mounting lugs for frame fixing, polycarbonate viewing window in the door and a 3-point door latching mechanism with a “tee” handle for ease of operator access. A door stay will be provided to help with operator convenience during the act of manual sampling.

The top of the cabinet will be fitted with a 25 mm plugged hole to allow for gas testing by the operator prior to opening the cabinet door. The bottom of the cabinet will have a gland plate which will have bulkhead connectors for each of the system connections and also facilitate any electrical connection points, an M8 earthing point will be provided as instructed for the cabinet. An internal anti-condensation heater will be provided within the panel as specified in section 6 of the liquid sampling system specification OGS have also catered for a small hazardous area light fitting inside the cabinet and an external switch to comply with the requirements of DEP 30.00.60.20-GEN (extract), Section 3.9, item 15. A Traffolyte label carrying the package tag number and equipment ident information would be provided on the fortnightly sampling cabinet.

Three-Monthly Sampling Facility

The three-monthly sampling cabinet is a 316 stainless steel uninsulated, unpainted construction, its design and layout being specifically arranged to house and access a Proserv 4 litre constant pressure sample cylinder. This cabinet will also have a polycarbonate viewing panel in the door which is also provided with 3-point latching mechanism and a “Tee” handle. Internal valving within the three monthly sampling cabinet will reflect the arrangement illustrated in Shell Procedure CC023, i.e. this will include valves V7 thro’ V12 as illustrated in the sampling diagrams along with associated tubing and fittings. Once again Parker “A-Lok” twin ferrule tube fittings will be used in conjunction with 3/8” OD Incoloy 825 tubing.

OGS would propose to use Parker 316 stainless steel needle valves for items V7 thro’ V12, these being supplied with integral 3/8” OD “A-Lok” tube fittings.

It was proposed that the cabinet construction had an internal shelf which would support the Proserv cylinder, we also provided locating blocks and toggle clamps or similar devices which would allow the cylinder to be held in place during the pre-charging and sampling procedures. Operating valves and tubing will be supported on an internal backplate within the sampling cabinet with valve handles all facing forwards for ease of use. This cabinet will also be fitted with a 25 mm plugged hole in the top to allow for gas testing prior to opening the cabinet door. The base of the sampling cabinet will have a gland plate through which bulkhead fittings will be provided for sample in, sample return, vent / drain and gas (Argon) connections. As with the fortnightly sampling system, an anticondensation heater an internal light and switch will be provided as will an M8 earthing connection.

Challenges

Technically the scope of supply did not introduce any major challenges to the project. There were one or two issues that should be mentioned however:

  1. As requested in the liquid sampling specification, provision had to be made for the location and connection of an Argon gas cylinder which is understood to be required for the inert gas supply for both fortnightly and three-monthly sampling systems. A specially mounted dual stage pressure control valve with integral pressure gauges was provided to facilitate local setting of the Argon supply pressure; and a flexible hose and suitable profile BS gas cylinder connection was also provided to assist the operator in the disconnection and replacement of the gas cylinder.
  2. OGS also ensured that the tubing for the inert gas supply was continued from the pressure regulator to both the fortnightly and three-monthly sampling panels in rigid tubing with associated tube fittings. We also proposed to continue the philosophy of Parker “A-Lok” 316 tube fittings and 3/8” OD Incoloy 825 tubing for the inert gas system in order to maintain continuity of fittings and tubing throughout the whole sampling package.
  3. The design of the final cabinet and stand arrangement was laid out to offer an ergonomic height for the operator when undertaking sampling and meet the guidelines of DEP 30.00.60.20-Gen where at all possible.
  4. The mounting stand was designed so that the gas cylinder can be located behind the sampling panels to allow sufficient access for gas cylinder changes and equipment maintenance.

Certifications & approvals

ISO 9001 SGS

ISO 9001 SGS

ISO 29001 SGS

ISO 29001 SGS

ISO 45001 SGS

ISO 45001 SGS

Achilles Oil and Gas Europe Registered

Achilles Oil and Gas Europe Registered

Achilles UVDB Registered

Achilles UVDB Registered

  • View all

OGS

Oil & Gas Systems Limited is a company registered in England

VAT numberGB 281 8714 79
Company number2167775
Registered address

Denmark House
St. Thomas Place
Ely, Cambridgeshire
CB7 4EX
United Kingdom

OGS

Denmark House
St. Thomas Place
Ely, Cambridgeshire
CB7 4EX
United Kingdom

  • +44 (0) 1353 66 66 40
  • info@oghl.co.uk
  • ogsl.com

Terms & policies

  • Terms & conditions
  • QHSE policies
  • Privacy policy
  • GDPR policy statement

Help & support

  • Contact
  • Search website
  • OGS
  • OGM
  • OGSI
  • © 2026 OGS
  • Oil & Gas Systems Limited t/a OGS